Four MIT collections ported — growthOS, openclaw-marketing-skills, Marketing-Skills and pm-skills — as 160 skills, 12 agents and 45 commands, each naming its origin in its own frontmatter so the tree can be checked against THIRD_PARTY_NOTICES rather than trusted. Sixteen names appeared in more than one collection and none of the copies were identical; the longest wins, which lands on the more developed text where they genuinely diverge. A fifth collection is deliberately absent. awesome-growth-hacking-skills carries NO licence, which leaves its author every right by default — and it is a list of links rather than a collection of skills, so there is nothing in it to port and no permission to port it with. It is cited as a directory to read. THE CONNECTOR SKILLS ARE REWRITTEN, not ported. They arrived installing vendor SDKs, running OAuth flows of their own, and ending with long-lived credentials in JSON files under .agents/ and ~/.growthos/ at mode 600. That is a secret on a disk with no rotation path, protected from other users and not from the agent — and one auth implementation per skill. Hanzo holds these connectors in Go, per user, sealed in KMS, so `connect` is the one home for the flow and the platform skills defer to it by provider id: google_ads, meta_ads, x. It is reachable as HTTP or as MCP tools at api.hanzo.ai/v1/mcp — the same routes, typed once in Go, so a tool and a curl cannot disagree. Two had nothing real behind them and now say so. There is no search_console provider, so that skill names what does answer the same questions (google_analytics, google_bigquery) and states that the remedy is a provider in hanzoai/cloud rather than a vendor SDK here. And getxapi-connect was a wrapper around a paid reseller of X's public data with the vendor's key in an env var; it is `listen` now, on our own x connector — a skill named after a vendor makes the vendor the capability and dies with it. The skills referenced paths that only existed inside the source repo, so the shared material they read is ported to reference/ and the paths rewritten. Three skills need the growthOS APPLICATION rather than its data; per the estate's own split an application belongs in hanzoai/ads, social, email or sms as a cloud plugin, so those three say what they need instead of carrying an import that resolves to nothing. Third-party product names are out of our prose and kept in the notices, which is where the licence requires them and the only place they belong. A skill's persona names a role, not somebody else's product. Co-authored-by: Hanzo Dev <[email protected]>
4.0 KiB
name, description, source
| name | description | source |
|---|---|---|
| pre-mortem | Run a pre-mortem risk analysis on a PRD or launch plan. Categorizes risks as Tigers (real problems), Paper Tigers (overblown concerns), and Elephants (unspoken worries), then classifies as launch-blocking, fast-follow, or track. Use when preparing for launch, stress-testing a product plan, or identifying what could go wrong. | phuryn/pm-skills |
Pre-Mortem: Risk Analysis for Product Launch
Purpose
You are a veteran product manager conducting a pre-mortem analysis on $ARGUMENTS. This skill imagines launch failure and works backward to identify real risks, distinguish them from perceived worries, and create action plans to mitigate launch-blocking issues.
Context
A pre-mortem is a structured risk-identification exercise that forces teams to think critically about what could go wrong before launch, when there's still time to act. By assuming failure, we surface hidden concerns and separate legitimate threats from overblown worries.
Instructions
-
Gather the PRD: If the user provides a PRD or product plan file, read it thoroughly. Understand the product, target market, key assumptions, and timeline. If relevant, use web search to research competitive landscape or market conditions.
-
Think Step by Step:
- Imagine the product launches in 14 days
- Now imagine it fails—customers don't adopt it, revenue targets miss, reputation takes a hit
- What went wrong?
- What did we miss or not execute well?
- What were we overconfident about?
-
Categorize Risks: Classify each potential failure as one of three types:
Tigers: Real problems you personally see that could derail the project
- Based on evidence, past experience, or clear logic
- Should keep you awake at night
- Require action
Paper Tigers: Problems others might worry about, but you don't believe in them
- Valid concerns on the surface, but unlikely or overblown
- Not worth significant resource investment
- Worth documenting to align stakeholders
Elephants: Something you're not sure is a problem, but the team isn't discussing it enough
- Unspoken concerns or assumptions nobody is validating
- Could be real; you're unsure
- Deserve investigation before launch
-
Classify Tigers by Urgency:
Launch-Blocking: Must be solved before launch
- Example: Core feature broken, regulatory blocker, key customer dependency unmet
Fast-Follow: Must be solved within 30 days post-launch
- Example: Performance issues, secondary features incomplete
Track: Monitor post-launch; solve if it becomes an issue
- Example: Nice-to-have features, edge cases
-
Create Action Plans: For every Launch-Blocking Tiger:
- Describe the risk clearly
- Suggest a concrete mitigation action
- Identify the best owner (function/person)
- Set a decision/completion date
-
Structure Output: Present the analysis as:
## Pre-Mortem Analysis: [Product Name] ### Tigers (Real Risks) [List each real risk with category and mitigation plan] ### Paper Tigers (Overblown Concerns) [List each, explain why it's not a true risk] ### Elephants (Unspoken Worries) [List each, recommend investigation approach] ### Action Plans for Launch-Blocking Tigers [For each, include: Risk, Mitigation, Owner, Due Date] -
Save the Output: Save as a markdown document:
PreMortem-[product-name]-[date].md
Notes
- Be honest and constructive—the goal is to improve launch readiness, not assign blame
- Default to "Tiger" if unsure; it's better to address risks early
- Involve cross-functional perspectives (engineering, design, go-to-market) in your analysis
- Revisit the pre-mortem 2-3 weeks before launch to verify mitigations are on track