mirror of
https://github.com/luxfi/dex.git
synced 2026-10-30 16:58:56 +00:00
ONE matching path: BackendGo (CPU). The pretend-acceleration cruft
is gone.
Removed (archive/lp108-2026-05-04/):
* pkg/engine/mlx_engine.go — claimed MLX-accelerated processing.
Real body was time.Sleep simulating GPU work + a hardcoded
597 ns/order constant. No Metal Performance Shaders, no MLX
device, no kernel.
* pkg/engine/mlx_engine_test.go — tested the stub.
* pkg/lx/fpga_accelerator.go — 484 LoC FPGA "accelerator". No
bitstream, no driver, interface-only.
* pkg/lx/fpga_accelerator_test.go — tested the stub itself
("DisabledFPGA returns error").
* pkg/fpga/* — 8 files, ~3K LoC of FPGA interfaces (amd_versal,
aws_f2, fpga_engine, fpga_interface, types, stubs + tests).
Interface-only. No hardware path.
Surgical edits to keep the rest of the test surface compiling:
* pkg/lx/orderbook.go::detectBestBackend — collapsed. Used to set
currentBackend to BackendGo/CGO/MLX/CUDA based on env probes;
nothing branched on the enum so the matching engine ran the Go
path regardless. Now: const Backend = BackendGo only. Removed
unused "os" + "runtime" imports.
* pkg/lx/critical_path_bench_test.go::BenchmarkFPGAAcceleration —
removed (called NewFPGAAccelerator).
* pkg/lx/coverage_improvement_test.go::TestFPGAAccelerator* —
removed (3 tests calling NewFPGAAccelerator).
* test/benchmark/orderbook_bench_test.go::BenchmarkMLXEngine —
removed. Called the standard CPU OrderBook then reported
b.ReportMetric(597, "ns/order") as a hardcoded literal.
* test/benchmark/orderbook_bench_test.go::BenchmarkPlanetScale —
removed. Entirely fabricated metrics (markets=5M, orders/sec=150M,
ns/order=597, watts=370, orders/watt=405405). No code in the
repo measured any of those.
What's left:
* BenchmarkOrderBook — real CPU path measurement
* BenchmarkOrderBookParallel — real CPU path measurement
* All match logic, order types, vault/margin/clearinghouse, etc.
Real measured numbers for the matching engine come from
luxcpp/dex/build/luxdex_bench (5.51 M orders/sec single-symbol on
Apple M1 Max). Anything labeled "GPU" or "FPGA" in benchmark
output of this repo is now removed because it didn't measure
GPU or FPGA work.
Verification on M1 Max:
* GOWORK=off go build ./pkg/lx/... ./test/benchmark/... — clean
* GOWORK=off go test -run='TestOrderBook$|TestNewOrderBook' ./pkg/lx/ — PASS
When real GPU/FPGA matching ships: add the variants back AND wire
through the match path AND a parity test vs BackendGo AND a
reproducible benchmark. LP-108 production gate applies.
554 lines
12 KiB
Go
554 lines
12 KiB
Go
package lx
|
|
|
|
import (
|
|
"fmt"
|
|
"math/big"
|
|
"math/rand"
|
|
"runtime"
|
|
"sync"
|
|
"sync/atomic"
|
|
"testing"
|
|
"time"
|
|
)
|
|
|
|
// Critical Path Benchmarks for LX
|
|
// These benchmarks test the most performance-critical code paths
|
|
|
|
// BenchmarkCriticalOrderMatching tests the core matching engine performance
|
|
func BenchmarkCriticalOrderMatching(b *testing.B) {
|
|
sizes := []int{100, 1000, 10000}
|
|
|
|
for _, size := range sizes {
|
|
b.Run(fmt.Sprintf("BookDepth_%d", size), func(b *testing.B) {
|
|
book := NewOrderBook("BENCH")
|
|
book.EnableImmediateMatching = false
|
|
|
|
// Pre-populate order book
|
|
for i := 0; i < size; i++ {
|
|
book.AddOrder(&Order{
|
|
ID: uint64(i),
|
|
Type: Limit,
|
|
Side: Buy,
|
|
Price: 100 - float64(i%50)/100,
|
|
Size: 100,
|
|
User: "bench",
|
|
Timestamp: time.Now(),
|
|
})
|
|
book.AddOrder(&Order{
|
|
ID: uint64(i + size),
|
|
Type: Limit,
|
|
Side: Sell,
|
|
Price: 101 + float64(i%50)/100,
|
|
Size: 100,
|
|
User: "bench",
|
|
Timestamp: time.Now(),
|
|
})
|
|
}
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
// Submit crossing order
|
|
order := &Order{
|
|
ID: uint64(i + size*2),
|
|
Type: Limit,
|
|
Side: Buy,
|
|
Price: 101.5,
|
|
Size: 10,
|
|
User: "taker",
|
|
Timestamp: time.Now(),
|
|
}
|
|
book.AddOrder(order)
|
|
}
|
|
|
|
// Report metrics
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "orders/sec")
|
|
})
|
|
}
|
|
}
|
|
|
|
// BenchmarkClearinghouseMargin tests margin calculation performance
|
|
func BenchmarkClearinghouseMargin(b *testing.B) {
|
|
ch := NewClearingHouse(nil, nil)
|
|
|
|
// Pre-populate accounts
|
|
numAccounts := 1000
|
|
for i := 0; i < numAccounts; i++ {
|
|
address := fmt.Sprintf("account_%d", i)
|
|
ch.Deposit(address, big.NewInt(1000000))
|
|
}
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
b.RunParallel(func(pb *testing.PB) {
|
|
i := 0
|
|
for pb.Next() {
|
|
address := fmt.Sprintf("account_%d", i%numAccounts)
|
|
ch.OpenPosition(address, "BTC-PERP", Buy, 0.1, Limit)
|
|
i++
|
|
}
|
|
})
|
|
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "positions/sec")
|
|
}
|
|
|
|
// LP-108: BenchmarkFPGAAcceleration removed alongside the FPGAAccelerator
|
|
// stub (archive/lp108-2026-05-04/fpga_accelerator.go). The accelerator was
|
|
// interface-only — no bitstream, no driver, no real FPGA dispatch. Real
|
|
// FPGA matching belongs as a separate project with a working hardware
|
|
// driver and a parity test against the CPU path.
|
|
|
|
// BenchmarkConsensusFinalization tests block finalization speed
|
|
func BenchmarkConsensusFinalization(b *testing.B) {
|
|
// Simulate consensus with varying block sizes
|
|
blockSizes := []int{100, 1000, 10000}
|
|
|
|
for _, size := range blockSizes {
|
|
b.Run(fmt.Sprintf("BlockSize_%d", size), func(b *testing.B) {
|
|
data := make([]byte, size)
|
|
rand.Read(data)
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
// Simulate block processing
|
|
hash := hashBlock(data)
|
|
_ = verifyBlock(hash)
|
|
}
|
|
|
|
b.ReportMetric(float64(size*b.N)/b.Elapsed().Seconds()/1024/1024, "MB/sec")
|
|
})
|
|
}
|
|
}
|
|
|
|
// BenchmarkOracleAggregation tests oracle price aggregation
|
|
func BenchmarkOracleAggregation(b *testing.B) {
|
|
ch := NewClearingHouse(nil, nil)
|
|
|
|
// Simulate price updates from multiple sources
|
|
prices := map[string]float64{
|
|
"validator1": 50000.0,
|
|
"validator2": 50001.0,
|
|
"validator3": 49999.0,
|
|
"validator4": 50000.5,
|
|
"validator5": 50002.0,
|
|
"validator6": 49998.0,
|
|
"validator7": 50001.5,
|
|
"validator8": 49999.5,
|
|
}
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
ch.UpdateOraclePrice("BTC", prices)
|
|
}
|
|
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "updates/sec")
|
|
}
|
|
|
|
// BenchmarkOrderBookSnapshot tests snapshot generation performance
|
|
func BenchmarkOrderBookSnapshot(b *testing.B) {
|
|
book := NewOrderBook("SNAPSHOT")
|
|
|
|
// Create deep order book
|
|
for i := 0; i < 10000; i++ {
|
|
book.AddOrder(&Order{
|
|
ID: uint64(i),
|
|
Type: Limit,
|
|
Side: Buy,
|
|
Price: 100 - float64(i)/1000,
|
|
Size: 100,
|
|
User: "maker",
|
|
Timestamp: time.Now(),
|
|
})
|
|
book.AddOrder(&Order{
|
|
ID: uint64(i + 10000),
|
|
Type: Limit,
|
|
Side: Sell,
|
|
Price: 100 + float64(i)/1000,
|
|
Size: 100,
|
|
User: "maker",
|
|
Timestamp: time.Now(),
|
|
})
|
|
}
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
snapshot := book.GetOrderBookSnapshot()
|
|
_ = snapshot
|
|
}
|
|
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "snapshots/sec")
|
|
}
|
|
|
|
// BenchmarkConcurrentOrderSubmission tests concurrent order processing
|
|
func BenchmarkConcurrentOrderSubmission(b *testing.B) {
|
|
book := NewOrderBook("CONCURRENT")
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
b.RunParallel(func(pb *testing.PB) {
|
|
i := 0
|
|
for pb.Next() {
|
|
order := &Order{
|
|
ID: uint64(atomic.AddInt64(&orderIDCounter, 1)),
|
|
Type: Limit,
|
|
Side: Side(i % 2),
|
|
Price: 100 + float64(i%20-10)/10,
|
|
Size: 100,
|
|
User: fmt.Sprintf("user_%d", i%100),
|
|
Timestamp: time.Now(),
|
|
}
|
|
book.AddOrder(order)
|
|
i++
|
|
}
|
|
})
|
|
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "orders/sec")
|
|
b.ReportMetric(float64(runtime.NumGoroutine()), "goroutines")
|
|
}
|
|
|
|
var orderIDCounter int64
|
|
|
|
// BenchmarkMemoryPool tests memory allocation efficiency
|
|
func BenchmarkMemoryPool(b *testing.B) {
|
|
pool := &sync.Pool{
|
|
New: func() interface{} {
|
|
return &Order{}
|
|
},
|
|
}
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
b.RunParallel(func(pb *testing.PB) {
|
|
for pb.Next() {
|
|
// Get from pool
|
|
order := pool.Get().(*Order)
|
|
order.ID = uint64(rand.Int63())
|
|
order.Type = Limit
|
|
order.Side = Buy
|
|
order.Price = 100
|
|
order.Size = 10
|
|
order.User = "pool_test"
|
|
order.Timestamp = time.Now()
|
|
|
|
// Process order
|
|
processOrder(order)
|
|
|
|
// Return to pool
|
|
order.Reset()
|
|
pool.Put(order)
|
|
}
|
|
})
|
|
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "allocs/sec")
|
|
}
|
|
|
|
// BenchmarkTradeExecution tests trade execution performance
|
|
func BenchmarkTradeExecution(b *testing.B) {
|
|
book := NewOrderBook("TRADE")
|
|
|
|
// Pre-populate with liquidity
|
|
for i := 0; i < 1000; i++ {
|
|
book.AddOrder(&Order{
|
|
ID: uint64(i),
|
|
Type: Limit,
|
|
Side: Sell,
|
|
Price: 100 + float64(i)/100,
|
|
Size: 1000,
|
|
User: "liquidity",
|
|
Timestamp: time.Now(),
|
|
})
|
|
}
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
// Market buy order that will execute
|
|
order := &Order{
|
|
ID: uint64(i + 1000),
|
|
Type: Market,
|
|
Side: Buy,
|
|
Size: 10,
|
|
User: "taker",
|
|
Timestamp: time.Now(),
|
|
}
|
|
trades := book.AddOrder(order)
|
|
_ = trades
|
|
}
|
|
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "trades/sec")
|
|
}
|
|
|
|
// BenchmarkRiskCheck tests pre-trade risk validation
|
|
func BenchmarkRiskCheck(b *testing.B) {
|
|
ch := NewClearingHouse(nil, nil)
|
|
|
|
// Setup account with balance
|
|
address := "risk_test"
|
|
ch.Deposit(address, big.NewInt(1000000))
|
|
|
|
account := ch.getOrCreateAccount(address)
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
// Perform risk check
|
|
passed := ch.performMarginCheck(account, "BTC-PERP", 1.0)
|
|
_ = passed
|
|
}
|
|
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "checks/sec")
|
|
}
|
|
|
|
// BenchmarkFundingCalculation tests funding rate calculations
|
|
func BenchmarkFundingCalculation(b *testing.B) {
|
|
ch := NewClearingHouse(nil, nil)
|
|
|
|
// Create accounts with positions
|
|
for i := 0; i < 100; i++ {
|
|
address := fmt.Sprintf("funding_%d", i)
|
|
ch.Deposit(address, big.NewInt(1000000))
|
|
ch.OpenPosition(address, "BTC-PERP", Side(i%2), 1.0, Limit)
|
|
}
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
ch.ProcessFunding()
|
|
}
|
|
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "funding_cycles/sec")
|
|
}
|
|
|
|
// BenchmarkDAGValidation tests DAG consensus validation
|
|
func BenchmarkDAGValidation(b *testing.B) {
|
|
// Simulate DAG validation
|
|
dag := make(map[string][]string)
|
|
|
|
// Build DAG structure
|
|
for i := 0; i < 1000; i++ {
|
|
nodeID := fmt.Sprintf("node_%d", i)
|
|
parents := make([]string, 0)
|
|
if i > 0 {
|
|
parents = append(parents, fmt.Sprintf("node_%d", i-1))
|
|
}
|
|
if i > 1 {
|
|
parents = append(parents, fmt.Sprintf("node_%d", i-2))
|
|
}
|
|
dag[nodeID] = parents
|
|
}
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
// Validate DAG structure
|
|
valid := validateDAG(dag)
|
|
_ = valid
|
|
}
|
|
|
|
b.ReportMetric(float64(len(dag)*b.N)/b.Elapsed().Seconds(), "nodes/sec")
|
|
}
|
|
|
|
// Helper functions for benchmarks
|
|
|
|
func hashBlock(data []byte) []byte {
|
|
// Simplified hash calculation
|
|
hash := make([]byte, 32)
|
|
for i := 0; i < len(data) && i < 32; i++ {
|
|
hash[i] = data[i]
|
|
}
|
|
return hash
|
|
}
|
|
|
|
func verifyBlock(hash []byte) bool {
|
|
// Simplified verification
|
|
return len(hash) == 32
|
|
}
|
|
|
|
func processOrder(order *Order) {
|
|
// Simulate order processing
|
|
time.Sleep(time.Nanosecond)
|
|
}
|
|
|
|
func (o *Order) Reset() {
|
|
o.ID = 0
|
|
o.Type = 0
|
|
o.Side = 0
|
|
o.Price = 0
|
|
o.Size = 0
|
|
o.User = ""
|
|
o.Timestamp = time.Time{}
|
|
}
|
|
|
|
func validateDAG(dag map[string][]string) bool {
|
|
// Simplified DAG validation
|
|
visited := make(map[string]bool)
|
|
for node := range dag {
|
|
if !visited[node] {
|
|
if !dfsVisit(node, dag, visited, make(map[string]bool)) {
|
|
return false
|
|
}
|
|
}
|
|
}
|
|
return true
|
|
}
|
|
|
|
func dfsVisit(node string, dag map[string][]string, visited, recStack map[string]bool) bool {
|
|
visited[node] = true
|
|
recStack[node] = true
|
|
|
|
for _, parent := range dag[node] {
|
|
if !visited[parent] {
|
|
if !dfsVisit(parent, dag, visited, recStack) {
|
|
return false
|
|
}
|
|
} else if recStack[parent] {
|
|
return false // Cycle detected
|
|
}
|
|
}
|
|
|
|
recStack[node] = false
|
|
return true
|
|
}
|
|
|
|
// BenchmarkMLXAcceleration tests MLX GPU acceleration
|
|
func BenchmarkMLXAcceleration(b *testing.B) {
|
|
if runtime.GOOS != "darwin" {
|
|
b.Skip("MLX only available on macOS")
|
|
}
|
|
|
|
// Skip for now as detectBestEngine is not yet implemented
|
|
b.Skip("MLX engine detection not implemented")
|
|
|
|
orders := make([]*Order, 1000)
|
|
for i := range orders {
|
|
orders[i] = &Order{
|
|
ID: uint64(i),
|
|
Type: Limit,
|
|
Side: Side(i % 2),
|
|
Price: 100 + float64(i%20-10)/10,
|
|
Size: 100,
|
|
User: "mlx_test",
|
|
Timestamp: time.Now(),
|
|
}
|
|
}
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
// Simulate MLX processing
|
|
_ = orders[i%len(orders)]
|
|
}
|
|
|
|
// Report simulated metrics
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "orders/sec")
|
|
}
|
|
|
|
// BenchmarkQuantumSignatures tests post-quantum signature verification
|
|
func BenchmarkQuantumSignatures(b *testing.B) {
|
|
// Simulate quantum-resistant signature verification
|
|
message := make([]byte, 256)
|
|
signature := make([]byte, 512)
|
|
publicKey := make([]byte, 256)
|
|
|
|
rand.Read(message)
|
|
rand.Read(signature)
|
|
rand.Read(publicKey)
|
|
|
|
b.ResetTimer()
|
|
b.ReportAllocs()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
// Simulate verification
|
|
valid := verifyQuantumSignature(message, signature, publicKey)
|
|
_ = valid
|
|
}
|
|
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "verifications/sec")
|
|
}
|
|
|
|
func verifyQuantumSignature(message, signature, publicKey []byte) bool {
|
|
// Simplified quantum signature verification
|
|
return len(signature) == 512 && len(publicKey) == 256
|
|
}
|
|
|
|
// BenchmarkEndToEndLatency tests complete order lifecycle
|
|
func BenchmarkEndToEndLatency(b *testing.B) {
|
|
book := NewOrderBook("E2E")
|
|
ch := NewClearingHouse(nil, nil)
|
|
|
|
// Setup account
|
|
ch.Deposit("e2e_test", big.NewInt(10000000))
|
|
|
|
// Pre-populate book
|
|
for i := 0; i < 100; i++ {
|
|
book.AddOrder(&Order{
|
|
ID: uint64(i),
|
|
Type: Limit,
|
|
Side: Sell,
|
|
Price: 101 + float64(i)/100,
|
|
Size: 100,
|
|
User: "liquidity",
|
|
Timestamp: time.Now(),
|
|
})
|
|
}
|
|
|
|
latencies := make([]int64, 0, b.N)
|
|
|
|
b.ResetTimer()
|
|
|
|
for i := 0; i < b.N; i++ {
|
|
start := time.Now()
|
|
|
|
// Complete order lifecycle
|
|
order := &Order{
|
|
ID: uint64(i + 100),
|
|
Type: Market,
|
|
Side: Buy,
|
|
Size: 10,
|
|
User: "e2e_test",
|
|
Timestamp: time.Now(),
|
|
}
|
|
|
|
// Risk check
|
|
account := ch.getOrCreateAccount("e2e_test")
|
|
if !ch.performMarginCheck(account, "E2E", order.Size) {
|
|
continue
|
|
}
|
|
|
|
// Order matching
|
|
trades := book.AddOrder(order)
|
|
|
|
// Position update
|
|
if trades > 0 {
|
|
ch.OpenPosition("e2e_test", "E2E", order.Side, order.Size, order.Type)
|
|
}
|
|
|
|
latency := time.Since(start).Nanoseconds()
|
|
latencies = append(latencies, latency)
|
|
}
|
|
|
|
// Calculate percentiles
|
|
if len(latencies) > 0 {
|
|
avgLatency := int64(0)
|
|
for _, l := range latencies {
|
|
avgLatency += l
|
|
}
|
|
avgLatency /= int64(len(latencies))
|
|
|
|
b.ReportMetric(float64(avgLatency), "ns/order")
|
|
b.ReportMetric(float64(b.N)/b.Elapsed().Seconds(), "orders/sec")
|
|
}
|
|
}
|