mirror of
https://github.com/zenlm/zen-blog.git
synced 2026-11-03 14:11:45 +00:00
b3b6eb0 ran a find-and-replace over the posts forked from the QwenLM
blog that turned "Qwen2" and "Qwen2.5" into "zen": Qwen2-57B-A14B read
as zen7B-A14B, Qwen2-72B as zen-72B, Qwen2AudioForConditionalGeneration
as a class that does not exist, and links such as
github.com/QwenLM/Qwen2 and the qianwen-res image paths pointed at
nothing. Every token is put back from the original post, aligned
against the rewritten one: 536 lines across 29 posts, and 116 of the
example files under public/cases.
These 44 posts are about another lab's releases and now say so with
"upstream: true" in their frontmatter. Two Zen posts lose the
base-model names they carried, and the Zen 3 post stops calling itself
the next generation.
21 lines
3.7 KiB
JSON
21 lines
3.7 KiB
JSON
{
|
||
"title": "Example: Key Information Extraction",
|
||
"messages": [
|
||
{
|
||
"role": "User",
|
||
"content": "蓄水工程花了多少钱\n"
|
||
},
|
||
{
|
||
"role": "Qwen2.5-VL",
|
||
"content": "根据表格中的数据,蓄水工程的总费用可以通过将所有相关项目的费用相加来计算。以下是各个项目及其费用:\n\n1. 新建200m³水池(1座):\n - 水池土方开挖: 2772.64\n - 水池石方开挖: 1088.91\n - 土方回填(夯实): 478.2\n - C20水池砼: 6494.81\n - C25水池底板砼: 9783.68\n - C25水池池壁砼: 16098.5\n - C25水池顶板砼: 5823.67\n - M7.5浆砌石: 1552.66\n - M7.5浆砌砖: 4793.26\n - 模板制安: 17140.86\n - 钢筋制安: 31853.91\n - 其它附件(含各种闸阀、检查孔、预埋件等配件): 50303.63\n\n2. 新建100m³水池(1座):\n - 土方开挖: 1304.48\n - 水池石方开挖: 582.71\n - 土方回填(夯实): 278.95\n - C20水池砼: 3352.16\n - C25水池底板砼: 5000.55\n - C25水池池壁砼: 8049.25\n - C25水池顶板砼: 2911.84\n - M7.5浆砌石: 373.49\n - M7.5浆砌砖: 1952.81\n - 钢筋制安: 15926.96\n - 模板制安: 8570.43\n - 其它附件(含各种闸阀、检查孔、预埋件等配件): 2000\n\n3. 新建20m³水池(1座):\n - 土方开挖: 552.3\n - 土方回填: 111.58\n - C25水池底板砼: 978.37\n - C25水池池壁砼: 2334.73\n - C25水池顶板砼: 1026.3\n - C20水池砼: 879.94\n\n现在我们将这些费用相加:\n\n2772.64 + 1088.91 + 478.2 + 6494.81 + 9783.68 + 16098.5 + 5823.67 + 1552.66 + 4793.26 + 17140.86 + 31853.91 + 50303.63 + 1304.48 + 582.71 + 278.95 + 3352.16 + 5000.55 + 8049.25 + 2911.84 + 373.49 + 1952.81 + 15926.96 + 8570.43 + 2000 + 552.3 + 111.58 + 978.37 + 2334.73 + 1026.3 + 879.94 = 244,400.08\n\n因此,蓄水工程的总费用为244,400.08元。"
|
||
},
|
||
{
|
||
"role": "User",
|
||
"content": "蓄水工程分哪几个大项目,分别多少钱"
|
||
},
|
||
{
|
||
"role": "Qwen2.5-VL",
|
||
"content": "根据提供的表格,蓄水工程可以分为以下几个大项目,并且每个项目的费用如下:\n\n### 1. 新建200m³水池(1座)\n- **土方开挖**:2772.64元\n- **石方开挖**:1088.91元\n- **土方回填(夯实)**:478.2元\n- **C20水池砼**:6494.81元\n- **C25水池底板砼**:9783.68元\n- **C25水池池壁砼**:16098.5元\n- **C25水池顶板砼**:5823.67元\n- **M7.5浆砌石**:1552.66元\n- **M7.5浆砌砖**:4793.26元\n- **模板制安**:17140.86元\n- **钢筋制安**:31853.91元\n- **其它附件(含各种闸阀、检查孔、预埋件等配件)**:50303.63元\n\n**小计**:158,287.93元\n\n### 2. 新建100m³水池(1座)\n- **土方开挖**:1304.48元\n- **石方开挖**:582.71元\n- **土方回填(夯实)**:278.95元\n- **C20水池砼**:3352.16元\n- **C25水池底板砼**:5000.55元\n- **C25水池池壁砼**:8049.25元\n- **C25水池顶板砼**:2911.84元\n- **M7.5浆砌石**:373.49元\n- **M7.5浆砌砖**:1952.81元\n- **钢筋制安**:15926.96元\n- **模板制安**:8570.43元\n- **其它附件(含各种闸阀、检查孔、预埋件等配件)**:2000元\n\n**小计**:50,282.62元\n\n### 3. 新建20m³水池(1座)\n- **土方开挖**:552.3元\n- **土方回填**:111.58元\n- **C25水池底板砼**:978.37元\n- **C25水池池壁砼**:2334.73元\n- **C25水池顶板砼**:1026.3元\n- **C20水池砼**:879.94元\n\n**小计**:5883.22元\n\n### 总计\n将上述三个大项目的费用相加:\n158,287.93 + 50,282.62 + 5883.22 = 214,453.77元\n\n因此,蓄水工程的总费用为214,453.77元。"
|
||
}
|
||
]
|
||
} |